Sample Kitchen Renovation

Sample Kitchen Renovation

Step 1: Planning & Design

Step 1: Planning & Design

  • Meet with clients to determine their needs and preferences. Develop a design plan that includes the layout, materials, fixtures, and finishes. Order any necessary materials and products.
  • Finalize the design plan and obtain necessary permits and approvals from local authorities.

Step 2: Demolition and Site Preparation

Step 2: Demolition and Site Preparation

Demolition of existing living room and kitchen and removal of debris. Site preparation, including framing, electrical and plumbing rough-ins, and installation of any necessary infrastructure.

Step 3: Installation and Finishing

Step 3: Installation and Finishing

Installation of cabinets, countertops, appliances, and fixtures. Finish work, including painting, flooring, and backsplash installation in the kitchen. In the living room, install flooring, paint, and any custom carpentry, such as built-in bookshelves or a fireplace mantel. Final touch-ups and installation of any remaining fixtures or finishes.

REQUEST FOR A QUOTE

Please note that timelines can vary depending on the specifics of the project and the availability of resources

We have the manpower…

Sample Commercial Construction


Sample Commercial Construction


Step 1: Pre-construction Planning and Design

Step 1: Pre-construction Planning and Design

  • Month 1: Site evaluation, zoning and permitting research, feasibility studies, and design plans.
  • Month 2-3: Finalize design plans, develop detailed construction schedule, secure necessary permits and approvals, hire subcontractors, and order materials.
  • Month 4: Begin site preparation and excavation.

Step 2: Construction

Step 2: Construction

  • Month 5-8: Begin construction, starting with foundation and framing, followed by installation of mechanical, electrical, and plumbing systems, insulation, and drywall.
  • Month 9-10: Finish interior work, such as flooring, painting, and cabinetry.
  • Month 11-12: Complete exterior work, such as landscaping, driveway paving, and fencing.

Step 3: Inspection & Finalization.

Step 3: Inspection & Finalization.

  • Month 13-14: Schedule inspections and testing for all construction work, including building and safety codes, environmental standards, and mechanical and electrical systems.
  • Month 15: Address any issues or deficiencies that arise during inspections and testing.
  • Month 16-17: Finalize all construction work and obtain certificates of occupancy.
  • Month 18: Conduct final walk-through with client to ensure satisfaction and hand over completed project.

REQUEST FOR A QUOTE

Please note that timelines can vary depending on the specifics of the project and the availability of resources